Substructure Logistics

Substructure Logistics Constructing the substructure requires the use of a lot of machinery, equipment and vehicles It is under the main contractors remit to assess site and produce a logistics plan for where the required plant and equipment will be…

Types of Superstructure

There are a number of different superstructure systems which can be used to support a building or structure. Determining the most suited superstructure (informally referred to as the frame) is critical to a job as it determines the design for…

Substructure Design

Substructure Design Design consultants assess the ground conditions, use of the proposed building and plan what Substructure elements would be best suited There are many different types of substructure systems the structural engineer can choose from. These options will be…

What is Substructure?

Substructure is a term used to describe anything from the top of the ground floor slab level down. Most of the elements which make up what is referred to as Substructure take the weight of the building sitting on it…

Piling Commercial

Piling Commercial Commercial departments on construction teams identify and develop business opportunities and manage profitability of a project from start to finish I recommend becoming familiar with the piling package documents to assess what works the subcontractors have allowed for.…

Piling Programme

Piling Programme A programme tells you when an activity starts, the duration and end date. It also shows you how activities link with one another. A programme is usually written by a Project Planner before works start on site. Many…

Piling Quality

Piling Quality Quality refers to the standard of workmanship, materials and processes used during construction. It involves adhering to design specifications, industry standards and best practises to ensure the end product achieves the intended performance and longevity. Where Quality is…

Piling Health, Safety & Environment

Piling Health, Safety & Environment How will operatives, the public and the environment be protected during piling works? According to the Health and Safety Executive: Managing risk is one part of health and safety management. You must also have arrangements…

Piling Build Sequence

Piling Build Sequence Before Piling Starts: Health and Safety – Check if all required documentation is in place, refer to Piling Health, Safety and Environmental Post for more information. Piling Platform – a check needs to be done to ensure…

Piling Temporary Works

Piling Temporary Works Temporary Works refer to any temporary structures, equipment or supports which are needed to facilitate safe construction, and enable building the permanent structure. They are usually designed by an independent temporary works engineer or by the Piling…